A typical VELUX skylight installation
happens in two worry-free phases.

Depending on the circumstances such as weather, roof pitch, interior light shaft depth and shape, installations can take between 2 and 5 days.

Office Renovation

Using:

Velux VSS
Solar Powered Skylights with solar powered blinds

 

Step #1:

The Rooftop

The rooftop portion of the installation includes cutting the hole, framing the shaft and fastening the skylight to the roof with the three layers of protection found in VELUX No Leak Skylights.

 

Family Room

Using:

Velux FS
Fixed Skylights

 

Kitchen

Using:

Velux FS C06
Fixed Skylights
with solar powered blinds

 

Step #2:

The Interior

It takes one to three days to complete the interior portion of the installation, which includes drywall and painting. The type of ceiling in your home — vaulted or flat — will also affect the amount of time it takes to complete the interior portion of the installation.

Flat ceilings require more drywall work than vaulted ceilings. If you have a flat ceiling, we will build a light shaft from the skylight to direct the daylight into the room and use drywall to to finish the shaft. We will paint the light shaft to match the surrounding ceiling area.

We will make every effort to protect your home’s interior from dust and other installation debris. Often, we will construct a curtain of plastic sheeting around the space in your ceiling where the skylight will be installed to contain dust.